Switchboards & Control Panels

Marine switchboards and control panels built around the system

WTM builds electrical and control assemblies with the wider application in mind. Layout, equipment, I/O, communications and serviceability are all designed around the system they have to support.

Application First

The panel is only useful if it suits the application

A standard enclosure filled with the correct parts is not automatically the right panel.

Marine and specialist equipment can introduce constraints around:

available space
cable entry
equipment location
heat
access
communications
serviceability
future modification
integration with existing systems

The panel needs to make sense inside that environment.

Panel Capability

Built around the equipment and control requirement

Control Panels

Electrical and control assemblies built around the functions the application needs to perform.

PLC Panels

Panels bringing PLC, I/O, control power and field interfaces together in one organised system.

I/O Panels

Central or distributed I/O assemblies for applications where field signals need to be collected and managed effectively.

Equipment Control Boards

Custom panels designed to run specific marine or industrial machinery safely and efficiently.

Built in the Workshop

Built in the workshop. Built for the application.

WTM's in-house panel-building capability keeps the physical build connected to the wider control requirement.

Panel assembly, wiring, component selection and internal organisation all affect installation, commissioning, maintenance and future changes.

A good panel should be clear, serviceable and easy to understand when someone needs to work on it later.

Marine electrical technician working on a control panel
Marine power and control equipment installation
Build Process

From requirement to integrated panel

01

Requirements

Understand what the panel needs to control, the signals involved, the available space and how it connects to the wider system.

02

Design & Layout

Arrange the equipment, select the hardware and plan access, wiring, I/O and serviceability around the application.

03

Build & Wire

Build the mechanical and electrical structure and complete the power, control and communications wiring clearly and practically.

04

Test & Integrate

Test the panel and its interfaces, then connect it into the equipment, field devices and control system it was built to support.

The details that matter after installation

Serviceability

Can someone understand and access the system when it needs attention?

Expansion

Is there a sensible path if another signal or function is added later?

Interfaces

Does the panel match the equipment, sensors and control architecture around it?

Wiring

Can field installation be completed clearly and practically?

Environment

Does the physical arrangement suit the space and conditions in which the panel will operate?

MORE THAN THE ENCLOSURE

Built with the wider system in mind

The panel sits between the field equipment and the control system. Decisions made during the panel build affect field wiring, I/O allocation, communications, equipment interfaces, commissioning and future maintenance.

Discuss a Panel Requirement